Project: Christ the Redeemer Primary School
Client: Board of Governors – Christ the Redeemer School
Value: £378,000
Service: Electrical

AEM’S Contribution:

Scope

The Board of Governors and Christ the Redeemer required the construction of a part single storey and part two storey primary school building and a single storey nursery school. The client also required for the inclusion of the provision, removal and relocation off site 3nr new temporary classrooms and the removal and relocation off site 4nr existing temporary classrooms.
Scale
The Board of Governors choose AEM Ltd to provide and install associated Electrical Installation that is associated with modern design implementation within the School Environment.

The installation and its fundamental conception ensured that the principles of Energy Conservation within the particular environment had been installed with the future in mind. This particularly came to the forefront in Daylight Dimming / Lighting Controls combined with Sensitive Presence Controls. Suited Master Key Controls to general Power Circuits ensured that Plug and Play items could not be left in a position that devices could be left to waste energy.

Further Electrical systems installed included:

• Fire Alarm
• Intruder Alarm
• CCTV
• Door Access,
• Audible Class Change system
• TV/Satellite & Radio System